06.02.2023 / RELOCATION SUCCESSFULLY CARRIED OUT IN THE SOUTH OF FRANCE

For our customer in the south of France, we successfully implemented the crane relocation from the assembly area to the final destination. To overcome the weight of about 810t over a distance of about 200m SPMTs were used. On the final rail, commissioning with the necessary test loads is now being carried out. Afterwards, the crane can go into operation after customer acceptance and will handle steel coils and slabs.